The Crossbuck
  • Home
  • Reference
  • News
  • Downloads
  • Contact Us
  • XML Symbol Editor

Login

  1. Home
  2. News

Run 8 Update 4 Released

Details
Written by: The Crossbuck Admin
Category: News
Published: 01 September 2022

Update 4 for Version 3 is now available for download on Run 8's website. Update 4 brings new functionality and fixes that were apparent after update 3 released. A change log can be found here.

Hits: 973
  • Update

Run8 Releases Dash 9 Pack 3

Details
Written by: The Crossbuck Admin
Category: News
Published: 01 September 2022

Run 8 Studios has released Dash 9 pack 3. Included in the pack:  

  • BNSF 02 BNSF Heritage 1
  • BNSF 04 BNSF Swoosh
  • CSX 01 - YN2 Scheme (Bright Future)
  • CSX 02 - YN3 Scheme (Dark Future)

Each locomotive has it's own style of cab that is specific to the railroad in which is belonged to as well as unique headlight locations. 

Dash 9 Cab Interior  BNSF 02 H1 Livery BNSF 04 BNSF Heritage 3 CSX 01 - YN2 Scheme (Bright Future) CSX 02 - YN3 Scheme (Dark Future)

Pick them up today from the Run8 Website

Hits: 930
  • Locomotives
  • Cajon Sub

Roseville Subdivision Release

Details
Written by: The Crossbuck Admin
Category: News
Published: 17 June 2022

Run 8 has released their first route since Version 3 hit the market earlier this year. The latest route the UP Roseville Sub is sure to impress. Included in the route is 255 miles of main line track starting just West of Roseville, California the track winds its way through the foothills of the Sierra Nevada and ultimately cresting the mighty Sierra Nevada Mountain passes before starting its decent though Truckee, Reno and Sparks. Along the way there are plenty of industries to work not to mention about 20 tunnels one of which is almost 2 miles long! 

This route typlicaly will see about 24 trains daily mostly UP with BNSF sharing trackage rights as well as one daily Amtrak in each direction, the California Zephyr. There are major yards at each end of the route. The JR Davis Yard is featured in Roseville, Ca and the Sparks Terminal can be found in Sparks, Nevada, just east of Reno.  The developers also complemented the route by including roughly 15 miles of the Valley subdivision to provide more industry switching out of Roseville. Be sure to pick up your copy today at Run 8 Studios website. 

Hits: 1924
  • Content
  • Routes
  • Version 3

V3 Update 3 Released

Details
Written by: The Crossbuck Admin
Category: News
Published: 26 May 2022

Update 3 for Version 3 is now available for download on Run 8's website. Update 2 brings new functionality and fixes that were apparent after update three released. A change log can be found here.

Hits: 1360
  • Update
  • Version 3

HyRail Simulations Waycross and A-Line Update 5.23.22

Details
Written by: The Crossbuck Admin
Category: News
Published: 23 May 2022

Hyrail Simulations has released an update which addresses various bug fixes and scenery enhancements. A change log can be viewed below

Inclusive Update now working for Windows 7 users

Changelog:

  • All Previous Installs Combined, fixed an issue with the installer copying to the wrong directory
  • Fixed Cars on Trim Side of Rice Yard B23 Fouling B22
  • Fixed some signal head Placements
  • Fixed Dark Signal issue at Green Cove Springs
  • Scenery Touch Ups in various places including some missing whistle post

IMPORTANT NOTE: Backup any Custom Config.ind you may have
The update can be found at the Hyrail Simulations Website.



Hits: 1307
  • Content
  • CSX
  • A-Line
  • WAX
  • Waycross
  • HyRail Simulations
  • Updates
  • Version 3
  1. Run8 Update 2 Release
  2. Run8 Releases Dash 9 Pack 2
  3. HyRail Simulations 03.09.22 Update
  4. V3 Update 1 Released

Page 8 of 16

  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
Copyright © 2023 The Crossbuck. All Rights Reserved.